You don't have javascript enabled. Good luck with that.
Pencarian
Perkembangan LRT Fase I Sudah 43,14 Persen
.
photo istimewa - Beritajakarta.id

LRT Phase I Project Has Reached 43.14 Percent

Light Rail Transit (LRT) Construction Phase I (Kelapa Gading-Velodrome Rawamangun) has touched 43.14 percent per October 31, 2017. It will be used to support Asian Games XVIII.

Rp 1.8 trillion or 26 percent has been absorbed from total of LRT budget by Rp 6.8 trillion

PT. Jakarta Propertindo (Jakpro) Secretary, Erry Gunari Perkasa said, 990 box girders and 79 spans have been installed by October 31. Besides, there also other construction, such as Jakarta LRT operator office, operation control center, power house, bogie workshop or train wheels, depot's ramp construction, railway mobilization to flyovers, and so on.

"Rp 1.8 trillion or 26 percent has been absorbed from total of LRT budget by Rp 6.8 trillion," he stated, Thursday (11/16).

LRT Phase 1 Construction Reaches 37 Percent

He explained 16 cars will be shipped in April 2018 for LRT Phase I operational.

"We target to start the installation of a 5.8-kilometer rail by the end of this year," he expressed.

He explained it will go through six stations; Depo Pegangsaan Dua Station, Station in front of Kelapa Gading Mall, Jl. Boulevard Raya Kelapa Gading, Jl. Kayu Putih Raya (Pulomas), Jl. Kayu Putih Raya (Equestrian), and station in front of Velodrome Rawamangun Sport Venue.

"We're optimistic to finish it on time," he closed.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye328 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye318 personAldi Geri Lumban Tobing
  4. Rivers with Severe Pollution in Jakarta Decrease

    access_time18-07-2025 remove_red_eye236 personAldi Geri Lumban Tobing
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye233 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik