You don't have javascript enabled. Good luck with that.
Pencarian
Perkembangan LRT Fase I Sudah 43,14 Persen

LRT Phase I Project Has Reached 43.14 Percent

Light Rail Transit (LRT) Construction Phase I (Kelapa Gading-Velodrome Rawamangun) has touched 43.14 percent per October 31, 2017. It will be used to support Asian Games XVIII.

Rp 1.8 trillion or 26 percent has been absorbed from total of LRT budget by Rp 6.8 trillion

PT. Jakarta Propertindo (Jakpro) Secretary, Erry Gunari Perkasa said, 990 box girders and 79 spans have been installed by October 31. Besides, there also other construction, such as Jakarta LRT operator office, operation control center, power house, bogie workshop or train wheels, depot's ramp construction, railway mobilization to flyovers, and so on.

"Rp 1.8 trillion or 26 percent has been absorbed from total of LRT budget by Rp 6.8 trillion," he stated, Thursday (11/16).

LRT Phase 1 Construction Reaches 37 Percent

He explained 16 cars will be shipped in April 2018 for LRT Phase I operational.

"We target to start the installation of a 5.8-kilometer rail by the end of this year," he expressed.

He explained it will go through six stations; Depo Pegangsaan Dua Station, Station in front of Kelapa Gading Mall, Jl. Boulevard Raya Kelapa Gading, Jl. Kayu Putih Raya (Pulomas), Jl. Kayu Putih Raya (Equestrian), and station in front of Velodrome Rawamangun Sport Venue.

"We're optimistic to finish it on time," he closed.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye787 personFakhrizal Fakhri
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye625 personTiyo Surya Sakti
  3. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye580 personAldi Geri Lumban Tobing
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye385 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye360 personNurito